Module 2

This module starts the long run along the east wall. From the ‘layout’ figure this is the module 2 below. Instead of simply using a number of boxes to hold up the roadbed I built some bench work reusing some bi-fold panels left from replacing then with 6 panel doors. The bench work is shown … Continue reading Module 2